Construction of Kotelna Park's second phase completed

by   CIJ Linguistics
2020-08-07   11:02
/uploads/posts/58bfdbc3d53f2317c3f0962785b6933d41800604/images/1197310740.png

The second phase of Kotelna Park in the Radlice valley portion of Prague 5 has been completed. The project is located next to the area's most visible landmark, a 120 meter chimney that was once part of a facility that provided heat for the entire area. The new building is six floors high and offers 12,000 sqm of class A office space. Kotelna Park Phase II is pre-certified as "very good" providing a high level of air exchanged through the use of modern air-conditioning units with double filtration. The area has been gaining in value rapidly thanks to the ongoing redevelopment of a former industrial facility across the street and Kotelna Park's neighbor CSOB which recently expanded its headquarters. Kotelna Park Phase II was designed by Chapman Taylor, featuring a glazed facade formed by rounded curves and well-lit interior space. The building has openable windows and external blinds as well as outdoor terraces located on all floors and a green park behind the building. As is becoming standard for new office buildings, it offers bike parking, showers and lockers as well as charging stations for electric vehicles.

https://www.kotelnapark.cz/en/

Switzerland
Albania
Asia
Austria
Belgium
Bosnia & Herzegovina
Bulgaria
Central Europe
China
Croatia
Czech Republic
Denmark
Estonia
Europe
Finland
France
Germany
Greece
Spain
Hungary
Italy
Kosovo
Latvia
Lithuania
Luxembourg
Moldova
Montenegro
Netherland
North Macedonia
Norway
Poland
Portugal
Romania
Russia
Serbia
Slovakia
Slovenia
Sweden
Ukraine
United Kingdom
USA